Fig. 275: Identifying Separate Plate
Courtesy of MAZDA MOTORS CORP.
79. Connect the manual valve link and install the control valve body component.
80. Temporarily install the control valve body component with the bolts.
Bolt length (measured from below the head)
A.
A: 31 mm {1.220 in}
B.
B: 17 mm {0.669 in}
C.
C: 21 mm {0.827 in}
Fig. 276: Locating Control Valve Body Component Bolts
Courtesy of MAZDA MOTORS CORP.
81. Temporarily install the suction cover and a new gasket with the bolts.
NOTE:
z
Aligning the bolt holes, temporarily tighten the bolts by hand.
2008 Mazda CX-9 Grand Touring
2005-08 TRANSMISSION Automatic Transaxle Overhaul (AW6A-EL) - CX-7, CX-9 & Mazda 6
Microsoft
Sunday, November 15, 2009 10:28:17 AM
Page 149
© 2005 Mitchell Repair Information Company, LLC.