z
If there is any bending, use the end of a flathead screwdriver to straighten fins.
HEATER PIPE AND HOSE COMPONENT REMOVAL/INSTALLATION
1. Remove the battery. (See
BATTERY REMOVAL/INSTALLATION [MZI-3.7]
.)
2. Drain the engine coolant. (See
ENGINE COOLANT REPLACEMENT [MZI-3.7]
.)
3. Remove the following parts:
1. Windshield wiper arm and blade. (See
WINDSHIELD WIPER ARM AND BLADE
REMOVAL/INSTALLATION
.)
2. Cowl grille (See
COWL GRILLE REMOVAL/INSTALLATION
.)
3. Windshield wiper motor (See
WINDSHIELD WIPER MOTOR
REMOVAL/INSTALLATION
.)
4. Cowl panel (See
COWL PANEL REMOVAL/INSTALLATION
.)
4. Remove in the order indicated in the table.
Fig. 27: Identifying Heater Pipe, Hose Component Removal/Installation Order & Torque
Specifications
5. Jack up the vehicle.
6. Under guard (LH) (See
CHARCOAL CANISTER, CANISTER VENT (CV) SOLENOID VALVE,
AIR FILTER COMPONENT REMOVAL/INSTALLATION [MZI-3.7]
)
2008 Mazda CX-9 Grand Touring
2008 HVAC Basic System - Mazda CX-9
Microsoft
Sunday, November 15, 2009 10:11:59 AM
Page 22
© 2005 Mitchell Repair Information Company, LLC.