1. Drain the engine oil. (See
ENGINE OIL REPLACEMENT [MZI-3.7]
.)
2. Remove the engine and transaxle component. (See
ENGINE REMOVAL/INSTALLATION [MZI-
3.7]
.)
3. Secure the engine and transaxle component using a hoist and the
SST.
4. Remove the dynamic chamber and throttle body as a single unit. (See
INTAKE-AIR SYSTEM
REMOVAL/INSTALLATION [MZI-3.7]
.)
5. Remove the ignition coils. (See
IGNITION COIL REMOVAL/INSTALLATION [MZI-3.7]
.)
6. Remove the dipstick.
7. Remove the power steering oil pump drive belt. (See
DRIVE BELT REMOVAL/INSTALLATION
[MZI-3.7]
.)
8. Remove the power steering oil pump. (See
POWER STEERING OIL PUMP
REMOVAL/INSTALLATION
.)
9. Follow the "TIMING CHAIN REMOVAL/INSTALLATION" procedure and removal the timing chain.
(See
TIMING CHAIN REMOVAL/INSTALLATION [MZI-3.7]
.)
10. Remove in the order indicated in the table.
11. Install in the reverse order of removal.
12. Start the engine and:
1. Inspect the runout and contact on the pulley and belt.
CAUTION:
z
When removing the timing chain and marking the timing marks
on the chain, mark the camshaft timing chain as well.
Fig. 16: View Of Engine & Transaxle Component With SST
Courtesy of MAZDA MOTORS CORP.
2008 Mazda CX-9 Grand Touring
2008 ENGINE Mechanical (MZI-3.7) - Mazda CX-9
Microsoft
Sunday, November 15, 2009 10:01:57 AM
Page 15
© 2005 Mitchell Repair Information Company, LLC.