6. Crimp the wheel side big boot band using the SST.
7. Verify that clearance B is within the specification.
z
If clearance B is more than the specification, reduce clearance A of the SST and crimp the boot
again.
z
If clearance B is less than the specification, replace the boot band, increase clearance A of the SST
and crimp the new boot.
Clearance B 2.4-2.8 mm {0.095-0.110 in}
8. Verify that the boot band does not protrude from the boot band installation area.
z
If it does, replace the boot band and repeat Steps 7 and 8.
JOINT SHAFT PRE-INSPECTION
1. Verify that the joint shaft is not twisted or cracked.
z
Replace it as necessary.
2. Turn the joint shaft by hand and verify that the bearing rotates smoothly and freely.
z
Replace it as necessary.
Fig. 24: Turning Joint Shaft
Courtesy of MAZDA MOTORS CORP.
JOINT SHAFT REMOVAL/INSTALLATION [2WD]
2008 Mazda CX-9 Grand Touring
2008 DRIVELINE/AXLES Drive Shaft - Mazda CX-9
Microsoft
Sunday, November 15, 2009 9:50:57 AM
Page 15
© 2005 Mitchell Repair Information Company, LLC.