
ASAI-EPT
Issue 4 May 2002
10-179
555-233-123
System Technician-Demanded Tests:
Descriptions and Error Codes
When inspecting errors in the system, always investigate errors associated with
the circuit pack and port first. Clearing these error codes first may also clear errors
generated against the endpoint. When all circuit pack and port errors have been
cleared, but errors still exist against the endpoint, investigate errors in the table
below. By clearing error codes associated with the Signaling Link Status Test, for
example, you may also clear errors generated from other tests in the testing
sequence.
BRI Layer 3 Query Test (#629)
This test is not used by the ASAI-ADJ maintenance object. For information about
this test, see BRI-SET in the maintenance documentation.
79
Service or
option not
implemented
Requested service or option (or combination of selected
options) is not supported (implemented) in switch or the
adjunct.
1. Consult switch and adjunct documentation to
determine ASAI service and options supported by both
switch and adjunct. Re-administration of the
switch-administered capabilities (see Customer
Optional Feature Form) or those of the adjunct may be
necessary to correct the problem.
81
Invalid CRV
An invalid CRV was sent by the adjunct.
1. This may indicate a CRV inconsistency between the
switch and the adjunct. See the CallVisor protocol
reference manual.
87
Internal switch
audit
There is an inconsistency in switch data records.
1. There is no action needed, since the switch has
corrected the data inconsistency.
Order of Investigation
Short Test
Sequence
Long Test
Sequence
D/ND
1
1
D = Destructive; ND = Nondestructive
Signaling Link Status Test (#626)
X
X
ND
Table 10-57. ASAI Cause Values — Continued
Code
Explanation
Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...