
Maintenance Commands and Trouble-Clearing Aids
555-233-123
8-450
Issue 4 May 2002
test isdn-testcall
This command starts an outgoing, asynchronous ISDN-PRI test call in the
asynchronous method from a specified trunk. If the test results are PASS, the test
call is started. A test result of ABORT means that a resource wasn’t available, for
example, B-channel or a Maintenance/Test circuit pack. A test result of FAIL
denotes that the outgoing ISDN-PRI test call was not established.
Feature Interactions
■
Use the status isdn-testcall command for details on how to access the
additional data available after running the test.
■
Only one ISDN trunk can be tested per port network at a time. Once testing
is completed, another ISDN trunk can be tested in that port network.
■
The maximum number of asynchronous outgoing test calls running
depends upon the number of Maintenance/Test circuit packs in the system.
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test
isdn-testcall
group
number
member
number
minute
number
schedule
The administered group number
associated with each trunk group
The administered member number
identifying a particular trunk within
a trunk group.
Duration of the test call in minutes
(1-120)
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
1
Examples:
test isdn-testcall 80/1
test isdn-testcall 80/1 schedule
test isdn-testcall 78/2 minutes 10
test isdn-testcall 78/3 minutes
100 schedule
1
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
duration
= 8.4 or
9.6 sec
See below
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...