
display test-schedule
Issue 4 May 2002
8-123
555-233-123
Output
The following is the output from the display test-schedule n command.
Field descriptions
Schedule
The current schedule number.
Schedule
Time
The hour and minute that the test begins (24-hour time, with “00:00”
being midnight). This time must be greater than the current time.
Schedule
Date
Month (1 to 12), day (1 to 31), and year on which testing begins (default
is the system date). Must be equal to or greater than the current date.
Schedule
Test Days
A y next to the days of the week indicates the days of the week this test
runs.
Interval
The length of this schedule in weeks. If this field is 0, the schedule runs
on the specified days only once.
OTL
Throttle
The number of concurrent tests run within a schedule. This guarantees
that all trunk members within a schedule are tested serially or if multiple
trunk members are tested from the same schedule.
Page 1 of 1
ATMS TRUNK TEST SCHEDULE
Schedule No: __
Schedule Time: __:__ Schedule Test Days Interval: __
Schedule Date: __/__/__ SU: _ TU: _ TH: _ SA: _ Duration: __
OTL Throttle: _ MO: _ WE: _ FR: _ Test Type: ______
Trk Bgn End Trk Bgn End Trk Bgn End Trk Bgn End Trk Bgn End
Grp Mem Mem Grp Mem Mem Grp Mem Mem Grp Mem Mem Grp Mem Mem
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...