
PKT-INT (Packet Interface)
Issue 4 May 2002
10-1311
555-233-123
Table 10-486.
TEST #886 Maintenance Looparound Test
Error
Code
Test
Result
Description/Recommendation
1006
1137
ABORT
Packet Interface is in the out-of-service state so normal
maintenance tests will not run on it.
1. Reset the Packet Interface using the reset
packet-interface CS command. Refer to the Packet
Interface Reset Test (#889) maintenance documentation for
further action.
1139
ABORT
The Packet Bus is alarmed
1. Try to retire the alarm associated with the Packet Bus. Refer
to the Alarm Log through the display alarms command.
Refer to the maintenance documentation for Packet Bus
Maintenance for further action.
2. Retry the command when the alarm associated with the
Packet Bus is retired.
1335
ABORT
Internal system error. The Packet Interface is on the standby
SPE and this test is not allowed to execute on a Packet
Interface on the standby SPE.
1. If you wish to run this test on a standby Packet Interface,
you must first make it active with reset system
interchange. .
1338
ABORT
The test is not allowed to run since a planned SPE interchange
is in progress. A planned interchange may be caused by 24
hour scheduled testing. During this time the terminal will be held
out of service but it should recover automatically after 3 minutes.
1. Wait 3 minutes and retry the command.
1373
ABORT
Could not establish the link loop around link to run this test.
1. Retry the command at 1-minute intervals, a maximum of 3
times.
2060
ABORT
Packet bus link went down during maintenance looparound test.
1. Retry the command at 1-minute intervals, a maximum of 5
times.
2. If there are errors associated with the Packet Bus, refer to
the maintenance information associated with the Packet
Bus.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals, a maximum of 5
times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...