
TIE-TRK (Tie Trunk)
Issue 4 May 2002
10-1771
555-233-123
Table 10-650.
Seizure Tests (#73, #747, #73)
Error
Code
Test
Result
Description/Recommendation
ABORT
Could not allocate the necessary system resources to run
this test.
1. Retry the command at one minute intervals a maximum
of 5 times.
1000
ABORT
System resources required to run this test are not available.
The trunk may be busy with a valid call. Use display trunk
xx to determine the trunk group/member number of the port.
Use status trunk to determine the service state of the port. If
the service state indicates that the port is in use, then the
port is unavailable for certain tests. You must wait until the
port is idle before retesting.
1. If the port status is active, but the port is not in use (no
calls), then check the Error Log for Error Type 1025 (see
Error Log table for description of this error and required
actions). The port may be locked up. The far-end PBX
may not be releasing.
2. If the port status is idle, then retry the command at
1-minute intervals a maximum of 5 times.
1004
ABORT
(Non-TN497 circuit packs only.) The port was seized by a
valid call during the test. The test has been aborted. Use
display trunk xx to determine the trunk group/member
number of the port. Use status trunk to determine the
service state of the port. If the service state indicates that the
port is in use, the port is unavailable for certain tests. (Refer
to the “Status Commands” section in
‘‘Maintenance Commands and Trouble-Clearing Aids’’
for a
full description of all possible states.) You must wait until the
port is idle before retesting.
1. Retry the command at one minute intervals a maximum
of 5 times.
2. If the test continues to abort, and the port is not in use,
escalate the problem.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...