
Maintenance Object Repair Procedures
555-233-123
10-972
Issue 4 May 2002
Table 10-351.
TEST #637 Remote Layer 3 Query
Error
Code
Test
Result
Description/Recommendation
ABORT
Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
1006
ABORT
This is a NORMAL ABORT. For country protocol 1 interfaces
(including the USA), either there are no B-channels
administered in this signaling group, or all B-channels in this
signaling group are either out-of-service or are in a “pending”
state (PINS or PMTC, indicating that a B-channel
maintenance message for that B-channel has been sent and
not yet acknowledged).
1. Administer an ISDN Trunk or PRI Endpoint Port
(B-channel) in this signaling group, or use the status
trunk TRK-GRP/TRK or status pri-endpoint
<extension> command to check the state of the ISDN
Trunks or PRI Endpoint Ports associated with this
signaling group. Refer to ISDN-TRK or PE-BCHL for
further details regarding service state definitions and
transitions. For systems not using country protocol 1
interfaces, there are no B-channels administered in this
signaling group.
1019
ABORT
There is already a Remote Layer 3 Query in progress. This is
a normal ABORT.
1. Wait two minutes, then follow the procedures for when this
test passes.
1113
ABORT
The Signaling Link is down. Therefore no messages can be
sent to the Far-end switch.
1. Examine the results of Tests #636 and #639 and follow
recommendations provided there.
2. If either test passes, it may be because the signaling link
was disabled by system technician. Verify this by using
the display comm link command. Tests #636 and #639
pass if the signaling link is not enabled.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...