
PR-MAINT (Maintenance Processor [TN2404/TN790
RISC Systems])
Issue 4 May 2002
10-1373
555-233-123
MTP Analog Loop Around Test (#103)
This test is a nondestructive test. The test does a loop around by using the MTP
INADS channel. Test data is sent through the modem out toward the INADS trunk.
The data is looped around before the actual trunk, and it comes back into the
on-board modem. The data is then verified for integrity. The internal modem is
tested when the internal modem is selected. The external modem is tested when
the external modem is selected.
When an external modem is administered in place of the internal modem, the test
loops data in the MTP DUART ahead of the connection to the external modem.
This test also causes the MTP DUART to verify that Clear-To-Send (CTS) is
being supplied by the modem.
NOTE:
The test does not send any data onto the INADS trunk. However, to pass,
the test does require the trunk to be present
Table 10-508.
TEST #103 MTP Analog Loop Around Test
Error
Code
Test
Result
Description/Recommendation
100
ABORT
The test did not complete within the allowable time period.
1. Retry the command.
1000
ABORT
System software resources required for this test are not available.
1. Retry at 1-minute intervals a maximum of 5 times.
1018
ABORT
The test has been disabled via administration.
1. To enable the test, issue the change system-parameters
maintenance command, and set the Test Remote Access
Port field to “y.”
2. Rerun the test.
1030
ABORT
This test is not run on the Standby SPE.
1050
ABORT
System could not determine if the testing of the INADS port is
administered.
1. Enter change system-parameters maintenance command,
and verify the entry for the Test Remote Access Port field.
2. Retry at 1-minute intervals a maximum of 5 times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...