
AN-LN-PT (Analog Line Port)
Issue 4 May 2002
10-123
555-233-123
Station Status and Translation Audits and
Updates Test (#36)
This test updates the analog port’s message lamp state (if it has one) and
translations with information in the software.
Table 10-41. Test #36 Station Status and Translation Audits and Updates
Error
Code
Test
Result
Description/Recommendation
ABORT
Necessary system resources could not be allocated to run
this test.
1. Retry the command at 1-minute intervals no more than 5
times.
2. If the test continues to abort, escalate the problem.
1004
ABORT
A valid call seized the port during the test and aborted the
test.
1. Use the display port UUCSSpp command to determine
the station extension.
2. Use the status station extension command to
determine the service state of the port.
3. If the port is in use, wait until the port is idle before
testing. Retry the command at 1-minute intervals no more
than 5 times.
4. If the test continues to abort, escalate the problem.
1005
ABORT
This test was aborted due to a configuration problem. The test
is not applicable for this type of analog port. This error can be
ignored.
1006
ABORT
The port is out-of-service. The busy station extension
command has been given to this port, or it has been taken
out-of-service by the failure of the NPE Crosstalk Test.
1. Look for error type 18 (port busied out) for this port. If this
error is present, release the port (release station
extension), and run the test again.
2. Check for error type 1537 (NPE Crosstalk Test failed) for
this port. If this error is present, investigate the errors
associated with the NPE Crosstalk Test (#6).
3. Make sure that the terminal is connected and in service,
and then retest.
2000
ABORT
Response to the test request was not received within the
allowable time period.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...