
Maintenance Object Repair Procedures
555-233-123
10-48
Issue 4 May 2002
1003
ABORT
The system could not allocate a tone receiver for the test. The
system may be oversized for the number of tone detectors
present or some tone detectors may be out-of-service.
1. Look for TTR-LEV errors in the Error Log. If present, refer
to “TTR-LEV”.
2. Look for TONE-PT errors in the Error Log. If present, refer
to “TONE-PT”.
3. Retry the command at 1-minute intervals a maximum of 5
times.
1004
ABORT
The port was seized by a valid call during the test. The test
has been aborted. Use the display port PCSSpp command
to determine the station extension. Use the status station
command to determine the service state of the port. If the port
is in use, wait until the port is idle before testing.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1005
ABORT
The test was aborted due to a configuration problem. This test
may not be applicable, or it may be disruptive to terminal
equipment other than a voice terminal (for example, the
modem pool member or Music On Hold).
1018
ABORT
The test has been disabled by administration. The default for
the
Test
field on the station form is y. Determine why this field
has been set to
n
on this station (this may be due to the
ringing application test 48, that can be customer or terminal
disturbing).
1. To enable the test for a particular station being tested,
enter change station extension and set the
Test?
field
on the station from
n
to y.
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
System resources required to run test are not available. This
could be due to a failure to seize the port.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Table 10-18.
TEST #6 NPE Crosstalk Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...