
Maintenance Object Repair Procedures
555-233-123
10-510
Issue 4 May 2002
Conference Circuit Test (#7)
The Conference Circuit Test verifies that the NPE channel for the port being
tested can correctly perform the conferencing function. The NPE is instructed to
listen to several different tones and conference the tones together. The resulting
signal is then measured by a Tone Detector port. If the level of the tone is within a
certain range, the test passes.
Table 10-187.
TEST #7 Conference Circuit Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1000
ABORT
System resources required to run this test are not available.
The port may be in use on a valid call. Use status
data-module to determine when the port is available for
testing.
1004
ABORT
The port has been seized by a user for a valid call. Use status
data-module to determine when the port is available for
testing.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1020
ABORT
The test did not run due to an already existing error on this
port (Error Type 769).
1. Refer to the procedure for Error Type 769. If Error Type
769 still occurs on this port, replace the circuit pack.
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Any
FAIL
The conference circuit test failed (possible off-board problem).
1. Busyout and release the port (data line), and then retest.
2. Replace the circuit pack if the test continues to fail.
PASS
The port can correctly conference multiple connections.
User-reported troubles on this port should be investigated
using other port tests, examining the ADU, external wiring,
and customer equipment.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...