
Maintenance Object Repair Procedures
555-233-123
10-432
Issue 4 May 2002
FAIL
Test failed due to internal system error.
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS
Trunk translation has been updated successfully. The current
trunk states kept in the DS1 Interface circuit pack and switch
software are consistent. If the trunk is busied out, the test does
not run, but returns to PASS. To verify that the trunk is
in-service:
1. Enter status trunk command to verify that the trunk is
in-service. If the trunk is in-service, no further action is
necessary. If the trunk is out-of-service, continue to Step
2.
2. Enter release-trunk command to put trunk back into
in-service.
3. Retry the test command.
0
NO
BOARD
The test could not relate the internal ID to the port (no board).
This result could be due to incorrect translations, no board is
inserted, an incorrect board is inserted, an insane board is
inserted, or the board is hyperactive (see note below).
1. Check to ensure that the board translations are correct.
Use the list config command, and resolve any problems
that are found.
2. If the board was found to be correctly inserted in step 1,
issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command.
This should re-establish the linkage between the internal ID
and the port. If this is not the case, dispatch to check to ensure
that there is a valid board inserted.
Hyperactivity causes some special problems with the
sequence suggested above. If the ports are translated after
issuing the list config command but the ’Vintage’ field reports
that there is no board (when there really is a board), then the
busyout board and the release busy board commands will
not work (even though the reset board command will work).
The software will put the hyperactive board back in service
after the hyperactivity clears.
Table 10-161.
TEST #36 Port Audit and Update Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...