
Maintenance Object Repair Procedures
555-233-123
10-1376
Issue 4 May 2002
MTP Dual Port Ram Test (#104)
This test is destructive.
The test terminates any PPN SAT session, and it is a coordinated test of the MTP
dual port ram (DPR). The DPR is a section of memory that is shared by the MTP
and by the RISC Processor circuit pack. Control messages and data are passed
through the DPR. The test forces both sides to read and write the DPR
simultaneously in alternate locations.
The DPR test causes the PPN SAT to log off before the test result is displayed.
The test result is determined according to the terminal from which the test is run. If
the test is run from the PPN SAT, system technician should log back in and
examine the Error Log for an error against PR-MAINT, with Error Type 769, no
Aux Data. This error entry indicates that the MTP DPR Test failed and that the
Processor circuit pack should be replaced.
NOTE:
If the test is being run from a terminal other than the PPN SAT (for example,
EPN SAT, remote access, etc.), the test results are displayed on the screen.
NOTE:
A dial-up (through the INADS port) does not display the results discussed in
the previous paragraph. However, a dial-up through data channels does
display these results.
Table 10-509.
TEST #104 MTP Dual Port Ram Test
Error
Code
Test
Result
Description/Recommendation
100
ABORT
The test did not complete within the allowable time period.
1. Retry the command.
1000
ABORT
System software resources required for this test are not
available.
1. Retry at 1-minute intervals a maximum of 5 times.
1030
ABORT
This test in not run on the Standby SPE.
2000
ABORT
The response to the test request was not received within the
allowable time period.
2028
ABORT
System software resources required for this test are not
available.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...