
Repair Procedures for High and Critical Reliability
Issue 4 May 2002
6-27
555-233-123
If the Standby Processor is not being replaced Install the replacement
circuit pack and reinsert the Standby SPE Processor circuit pack.
a. If the circuit pack that was replaced was the TN772 Duplication
Interface in the A carrier, the system access terminal is logged off.
Login back into the system and proceed to Step 7.
5. If the circuit pack to be replaced is a TN2404/TN790 Standby SPE
Processor circuit pack loaded with the same software as loaded in the
Active Processor or is a Standby SPE Processor circuit pack, install the
circuit pack and proceed to Step 7.
6. If the circuit pack to be replaced is a TN2404/TN790 Standby SPE
Processor circuit pack and the software is being loaded from the generic
program card, continue with the following steps:
NOTE:
The TN2404/TN790 must have the same number of SIMMs as the replaced
circuit pack.
a. Insert the generic program card into the Active SPE. Issue the list
configuration software-versions command. If the software
matches and the UPDATE FILE Identifier displays none, continue
with this procedure. Replace the translation card in the Active SPE.
b. Insert the generic program card into the Standby SPE.
c. Install the TN2404/TN790 Standby Processor circuit pack. When the
Standby Processor starts to initialize and detects the program card,
it does a software upgrade and displays the progress of this
upgrade on the terminal.
d. When prompted, replace the program card in the Standby SPE with
the translation card. The Standby SPE boots up with the translation.
NOTE:
Perform this operation within two minutes. Otherwise the
Standby SPE will boot up without translations. However, it will
recover the translations when the Active SPE enables memory
shadowing to the Standby SPE.
e. At the prompt REPLACE TRANSLATION MEM-CARD ON
<ACTIVE SPE> WITH SOFTWARE MEM-CARD, wait 3 minutes for
the Standby SPE to initialize before proceeding to next step.
f. Issue the list configuration software-versions long command to
ensure that both SPEs are running identical software. Use the next
step if the this command does not display the software versions,
otherwise skip the next step.
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...