
UDS1-BD (UDS1 Interface Circuit Pack)
Issue 4 May 2002
10-1871
555-233-123
1313
FAIL
The UDS1 circuit pack could not deactivate a CPE Loopback Jack
loopback.
1. Execute the test ds1-loop UUCSS end-loopback/span-test
command.
2. If the attempt to deactivate the CPE Loopback Jack is not
successful, check the cabling and investigate the problem at
the CPE Loopback Jack.
3. Run the test again.
1314
FAIL
The UDS1 circuit pack could not deactivate a far-end CSU
loopback.
1. Execute the test ds1-loop UUCSS end-loopback/span-test
command.
1320
FAIL
A CSU Module/Sync Splitter hardware failure, or an ICSU/Sync
Splitter serial interface audit failure was detected by the UDS1
circuit pack.
1. Replace the CSU module/Sync Splitter, and then run the test
again.
2. If the test continues to fail with this error code, replace the
UDS1-BD circuit pack and run the test again.
3. If the test continues to fail with this error code, then the
problem could be in the I/O cable between the backplane and
the CSU module/Sync Splitter.
1321
FAIL
DTE LOS (loss of signal) was detected between the UDS1 board
and the CSU Module or the Sync Splitter. Either the UDS1 board,
the CSU Module/Sync Splitter, or the I/O cable between the
backplane and the CSU module/Sync Splitter (or any combination
thereof) has failed. Attempt to isolate the problem to one of these
areas.
1. Replace the CSU Module/Sync Splitter and run the test
again.
2. If the test continues to fail with this error code, then replace
the UDS1-BD board and run the test again.
3. If the test continues to fail with this error code, the problem
could be in the I/O cable between the backplane and the CSU
module/Sync Splitter.
Table 10-673.
TEST #138 Loss of Signal Alarm Inquiry Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...