
Maintenance Commands and Trouble-Clearing Aids
555-233-123
8-418
Issue 4 May 2002
Action/
Object
Qualifier
Qualifier Description
Logins
Default
Feature
Inter-
actions
test
analog-
testcall
full
no super-
vision
no-
selftest
no-return-
loss
no-st-or-rl
repeat
number
schedule
Executes the most comprehensive test call
available using the administered test set type.
Executes a supervision-only test call (approx. 10
sec.) and confirms the presence of the test set at
the far end.
Executes the “full” test (skips any self-test
sequences), saving about 20 seconds on the
type 105 transmission test and has no effect on
type 100 or 102 transmission tests.
Executes the “full” test (skips any return loss
sequences), saving about 20 seconds on the
type 105 transmission test and does not have
any effect on type 100 or 102 transmission tests.
Executes the “full” test (skips all self test and
return loss sequences), saving about 40
seconds on the type 105 transmission test and
does not have any effect on type 100 or 102
transmission tests.
How many times each test in the sequence is
repeated (1-100)
Command is validated and then a scheduling
form displays to schedule execution of the
command. The command is then placed in the
command queue and is executed at the
specified time. The information displayed by the
command is sent to the system printer instead of
the screen.
1
1
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
cust
Test
sequence
= long;
repeat = 1
See
below
Examples:
test analog-testcall trunk 78 f
test analog-testcall trunk 78 f schedule
test analog-testcall trunk 80/1 s r 2
test analog-testcall trunk 80/1 s r 2 schedule
test analog-testcall trunk 78/2 no-selftest r 10
test analog-testcall trunk 78/2 no-selftest r 10
schedule
test analog-testcall trunk 78 r 4
test analog-testcall trunk 78 r 4 schedule
test analog-testcall port 2a1505 no-st-or-rl r 4
test analog-testcall port 2a1505 no-st-or-rl r 4
schedule
test analog-testcall board 2a15
test analog-testcall board 2a15 schedule
test analog-testcall port 2a1505
no-return-loss
test analog-testcall port 2a1505
no-return-loss schedule
te an t 80
te an t 80 schedule
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...