Maintenance Object Repair Procedures
555-233-123
10-1152
Issue 4 May 2002
1004
ABORT
The port was seized by a valid ISDN-PRI Test Call. Use
list isdn-testcall to determine which call is using the port
(from the M/T Port column). Either wait for the test call to
complete (as indicated in the Start Time and Duration fields
of the above display), or abort the test call with clear
isdn-testcall tg/mem, where tg/mem is determined from
the B-channel field of the above display.
1. Retry the command at one-minute intervals a
maximum of 5 times.
2. If the test continues to abort and the port is not in use,
escalate the problem.
2000
ABORT
Response to the test request was not received within the
allowable time period.
1. Retry the command at one-minute intervals a
maximum of 5 times.
2100
ABORT
System resources required to run this test are not
available.
1. Retry the test at one-minute intervals a maximum of 5
times.
7
FAIL
Conference test failed on the primary information channel.
In most cases, the user may not notice a disruption in
service.
1. Run the circuit pack tests to check the Tone Generator
circuit pack and the Tone Detector circuit pack via the
test board PCSS command.
2. Resolve any problems that are detected on the Tone
Generator circuit pack or Tone Detector circuit pack.
3. If the Tone Generator and Tone Detector circuit packs
are functioning properly, and the test still fails, replace
the Maintenance/Test circuit pack.
Table 10-434.
TEST #13 Digital Port Loop Around Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...