
XXX-BD (Common Port Circuit Pack)
Issue 4 May 2002
10-2017
555-233-123
2000
ABORT
Response to the request was not received within the allowable
time period.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
ABORT
Could not allocate the necessary system resources to run this
test. Internal System Error.
1. If Error Type 1538 is present in the Error Log, follow the
recommended maintenance strategy.
FAIL
The test failed because no neon current was detected.
1. Determine if there is a TN755 or TN752 power unit circuit
pack installed in the same carrier as the TN746 or TN769
analog line circuit pack that failed the test. Look for the failure
of test 220 on other TN746 or TN769 circuit packs in the
carrier. If test 220 fails on the other circuit packs, replace the
TN755 or TN752 power unit circuit pack.
2. Retry the command again.
3. If the test continues to fail, replace the circuit pack.
4. Retry the command again.
PASS
This circuit pack is a TN746 or TN769 Analog Line circuit pack
and the neon current is detected. This test also returns PASS for
circuit packs that are not TN746 or TN769 circuit packs, but the
test is not run on the circuit pack and the results of this test can be
ignored.
any
NO
BOARD
This is normal if the test is being done when (a) the circuit pack is
not physically in the system or (b) the system is booting up.
Otherwise, there is some inconsistency between the physical
configuration and the data kept in the system.
1. Verify that the circuit pack is physically in the system.
2. Verify that the system is not in a stage of booting up.
3. Retry the command at 1-minute intervals for a maximum of 5
times.
Table 10-725.
TEST #220 Neon Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...