
Maintenance Object Repair Procedures
555-233-123
10-762
Issue 4 May 2002
A system with EPN(s) may have one or two pairs of Expansion Interface circuit
packs connecting any two cabinets. If two pairs exist, one pair operates as the
Active pair and provides the required connectivity. The second pair acts as a hot
Standby. When a problem arises on the Active pair, the Standby pair may be
called upon to take over and provide continuous service with stable calls being
preserved. The Expansion Interface circuit packs must be inserted into fixed slots.
The valid slots for Expansion Interface circuit packs are: 1A01, 1A02, 1B01, 1B02,
2A01, 2A02, 2B02, 2B03, 3A01, 3A02, 3B02, or 3B03. It is also a requirement that
the fiber cables be connected according to the following table:
NOTE:
If Expansion Interface circuit packs are connected in any other way, they do
not function properly.
The Active Expansion Interface Link may be selected by system technician via the
set expansion-link PCSS command, where PCSS is the address of either
Standby Expansion Interface circuit pack. System Technician may prevent the
system from switching Expansion Interface Links by using the busyout board
PCSS command, where PCSS is the address of either Standby Expansion
Interface circuit pack. These two commands are described later in greater detail in
the “Expansion Interface Link Switch Command” section (located at the end of this
EXP-INTF Maintenance documentation).
A G3MT terminal connected to an EPN [G3i] provides the same maintenance and
administrative capabilities as the local administration terminal, but at a slower
transmission speed. The EPN Maintenance circuit pack also provides Emergency
Transfer and environmental monitoring functions for the EPN.
Table 10-287.
Expansion Interface Circuit Pack Connections
EXP-INTF
in slot
connected to
EXP-INTF in slot
Description
1A01
2A01
Network 1 to Network 2
1B01
2B02
Network 1 to Network 2 (Duplicated Link)
1A02
1
1
G3iV1.1-286 and G3iV2-386 only.
3A01
Network 1 to Network 3
1B02
1
3B02
Network 1 to Network 3 (Duplicated Link)
2A02
1
3A02
Network 2 to Network 3
2B03
1
3B03
Network 2 to Network 3 (Duplicated Link)
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...