
test shadow-link
Issue 4 May 2002
8-477
555-233-123
test shadow-link
This command performs hardware diagnostics for the shadow link between the
two duplication-interface circuit packs. This command works only with High or
Critical Reliability systems. Refer to
Chapter 6, ‘‘Reliability Systems: A
Action/
Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test
shadow-link
short
long
repeat
number
clear
schedule
Both the short and long test
sequence execute only Test
#318.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to
repeat until the alarm (if any) is
cleared or a single test in the
sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue
and is executed at the specified
time. The information displayed
by the command is sent to the
system printer instead of the
screen.
2
Examples:
test shadow-link l
test shadow-link sh r 2
test shadow-link sh r 2
schedule
test shadow-link c
1
If no alarms are registered against the maintenance object then the test sequence is run only once. The long
clear option forces a clear of all alarms if no errors are encountered during testing. The short clear option only
clears alarms pertinent to tests in the short sequence.
2
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
Sequence
= short;
Repeat = 1
none
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...