
test interface
Issue 4 May 2002
8-449
555-233-123
Output
The following example shows the output for the test interface a1 command. The
responses display on a test-by-test basis with one line of data for each test result.
Field descriptions
Port
Port address: cabinet-carrier-slot (the carrier associated with
the particular processor interface board)
Maintenance
Name
The name of maintenance object
Alt. Name
Blank.
Test No
The test being executed
Result
Test result: Pass, Abort, Fail, No Board, Disabled, or Extra Bd.
Error Code
Numeric code explaining why the release failed or aborted.
Refer to the detailed list of codes by test number for each MO.
test interface a1
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01A1 PI-SCI 231 PASS
01A1 PI-BD 52 PASS
Command Successfully Completed
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...