
Maintenance Object Repair Procedures
555-233-123
10-1440
Issue 4 May 2002
Station Present Test (also called Ringing
Application Test) (#48)
This test applies momentary ringing voltage to the terminal equipment and
monitors resulting current flow to determine whether the terminal equipment is
connected to the port. The test may cause some terminal equipment to ring briefly
during daily maintenance. If this ringing disturbs the customer or the terminal
equipment, disable it via the
Tests
field on the change station form. However,
on some software releases, Test #35 is disabled.
Table 10-546.
TEST #48 Station Present Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a
maximum of 5 times.
1000
ABORT
System resources required to run this test are not available.
The port may be busy with a valid call. Use the display port
UUCSSpp command to determine the station extension. Use
the status station command to determine the service state of
the port. If the service state indicates that the port is in use.
Wait until the port is idle.
1. Retry the command at 1-minute intervals a
maximum of 5 times.
1004
ABORT
The port was seized by a valid call during the test, and the test
was aborted. Use the display port UUCSSpp command to
determine the station extension. Use the status station
command to determine the service state of the port. If the
service state indicates that the port is in use. Wait until the port
is idle.
1. Retry the command at 1-minute intervals a
maximum of 5 times.
1005
ABORT
The test was aborted due to a configuration problem. This test
may not be applicable, or it may be disruptive to terminal
equipment other than a voice terminal (for example, the
modem pool member or Music On Hold).
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...