
test link
Issue 4 May 2002
8-455
555-233-123
test link
This command validates that a specified link is administered and then performs a
set of hardware diagnostic tests on the link.
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible for
firmware counters to be cleared even when a problem exists. In some cases
customer service might degrade since calls may be routed over defective
equipment.
Action/
Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test link
link-id
short
long
repeat
number
clear
schedule
Link number (1-8; assigned via the
communication-interface links
form)
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
Number of times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test link 1
test link 1 schedule
test link 3 l
test link 2 sh
test link 2 r 2
test link 2 l c
1
If no alarms are registered against the maintenance object then the test sequence is run only once. The long
clear option forces a clear of all alarms if no errors are encountered during testing. The short clear option only
clears alarms pertinent to tests in the short sequence.
2
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
sequence =
short; repeat
= 1
none
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...