Maintenance Object Repair Procedures
555-233-123
10-772
Issue 4 May 2002
Notes:
a. Expansion Interface (EI) circuit pack has been busied out by system
technician.
b. EI circuit pack has been administered on the Circuit Pack form, but has not
been physically inserted into the system. Insert the circuit pack.
c. A wrong circuit pack is inserted in the slot where this circuit pack is logically
administered. To resolve this problem, either remove the wrong circuit pack
and insert the logically administered circuit pack OR use the change
circuit-pack command to re-administer this slot to match the circuit pack
inserted.
d. This alarm is raised after an EI circuit pack has been removed from a slot
for 11 minutes. The alarm is resolved when the EI circuit pack is inserted
into this slot. Another way to resolve or prevent this alarm is to use the
change circuit pack command to remove the EI circuit pack
administrative entry for this slot after the EI circuit pack has been removed
from the slot. Or, if the circuit pack is in the system and the red LED is on,
then follow the instructions for “Red (alarm)” in the “Control and Port Circuit
Pack Status LEDs” section in Chapter 7, “LED Interpretation”.
10004 (v)
0
None
11000 (w)
0
None
11000 (x)
2
None
11000 (y)
3
None
11000 (z)
4
None
11000 (aa)
5
None
11000 (ab)
8
None
11001 (ac)
0
None
1
Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
2
Minor alarms on this MO may be downgraded to Warning alarms based on the value used in the
set options command.
Table 10-288.
Expansion Interface Circuit Pack Error Log Entries — Continued
Error Type
Aux
Data
Associated Test
Alarm
Level
On/
Off
Board
Test to Clear Value
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...