
BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI
ISDN-BRI Port)
Issue 4 May 2002
10-283
555-233-123
The Pending Activation state indicates a problem with the endpoints or adjunct,
the wiring to the sets or adjunct, or the BRI-LINE circuit pack. When in this state,
the Level 1 interface is either not receiving any L1 framing from the endpoint or
adjunct (Endpoint Idle), or it is communicating with the endpoint or adjunct but
cannot transition to the Activated state (Endpoint Active).
The Deactivated state indicates a problem with the BRI-LINE circuit pack. When
in this state, the Level 1 interface is idle and is not trying to communicate with the
BRI endpoints or adjunct. When an ISDN-BRI port is placed in the out-of-service
state, Level 1 is also put into the Deactivated state. This could be due either to the
system detecting a fault with the port or to a busyout port PCSSpp request.
Table 10-113.
TEST #621 Level 1 Status Inquiry
Error
Code
Test
Result
Description/Recommendation
1187
ABORT
The board, port or station may have been busied out by a
technician.
1. Look in the Error Log for Error Type 18 (port busied out)
for this port and BRI-BD (board busied out). If this error
type is present for BRI-PORT only, then release the port
via the release port pp command and run the test again.
If the error is present for both BRI-BD and BRI-PORT, then
release the board via the release port PCSS command
and run the test again.
NOTE:
When you release a port, you release all ports
associated with it. If certain ports still need to be busied
out, use the release port PCSSpp command to busy
them out.
2. Make sure the terminal is connected.
3. Retry the command at 1-minute intervals a maximum of 5
times.
2000
ABORT
Response to the test was not received from the circuit pack
within the allowable time period.
1. If the test aborts repeatedly a maximum of five times, reset
the circuit pack via the busyout board PCSS and reset
board PCSS commands.
2. If the test aborts again, replace the circuit pack.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...