
Maintenance Object Repair Procedures
555-233-123
10-1536
Issue 4 May 2002
93
Switch Control Reset Test (SW-CTL)
X
325
Destructive EPN Maintenance Board Interface Test
(SW-CTL)
X
95
Time-of-Day Clock Test (SW-CTL)
X
X
92
Control Channel Interface Test (SW-CTL)
X
X
94
Control Channel Transmission Test (SW-CTL)
X
X
324
EPN Maintenance Board Interface Test (SW-CTL)
X
X
77
Processor Software Initiated Interrupt Test (PROCR)
X
X
80
Processor ROM Checksum Test (PROCR)
X
X
82
Processor Non-Maskable Interrupt Test (PROCR)
X
X
83
Processor Sanity Timer Test (PROCR)
X
102
MTP Outpulse Relay Test (PR-MAINT)
X
X
103
MTP Analog Loop Around Test (PR-MAINT)
X
X
106
MTP Sanity Handshake Test (PR-MAINT)
X
X
228
MTP Manager I Channel Loop Around Test
(PR-MAINT)
X
X
229
MTP Auxiliary Channel Loop Around Test
(PR-MAINT)
X
X
101
MTP Reset Test (PR-MAINT)
X
104
MTP Dual Port RAM Test (PR-MAINT)
X
The following Memory Card tests are executed:
695
Cartridge Insertion Test (CARD-MEM)
X
X
696
Cartridge Format and Read Test (CARD-MEM)
X
X
697
Cartridge Match Test (CARD-MEM)
X
X
698
Cartridge Write-Protected Test (CARD-MEM)
X
X
699
Cartridge Directory Sanity Check and Recovery Test
(CARD-MEM)
X
X
694
Cartridge Translation Data Integrity Test
(CARD-MEM)
X
693
Cartridge Erase/Write/Read Test (CARD-MEM)
X
703
Flash Data Consistency Test (FL-DATA)
X
For each Processor Interface circuit pack in the Standby SPE, the following PI-BD tests are
run:
52
Control Channel Test (PI-BD)
X
X
50
NPE Audit (PI-BD)
X
423
Standby PI Board Test (PI-BD)
X
X
Table 10-577.
Test Sequence of Test SPE-Standby — Continued
Test
Number
Name of Test and Associated MO
Short Test
Sequence
Long Test
Sequence
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...