
SW-CTL (Switch Control)
Issue 4 May 2002
10-1579
555-233-123
Control Channel Transmission Test (#94)
Control channel messages are sent from the SPE to selected port circuit packs
and the response from the port circuit packs is checked. This tests the ability of
the Switch Control to send and receive messages on the control channel of the
TDM Bus.
This test cannot run on the Standby SPE Switch Control. Therefore, it is possible
to have defective hardware on the Standby NetPkt or Netcon circuit pack that is
not detectable.
Table 10-584.
TEST #94 Control Channel Transmission Test
Error
Code
Test
Result
Description/Recommendation
0
ABORT
The port circuit packs necessary for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If the test continues to abort, then replace the NetPkt or
Netcon circuit pack.
1030
ABORT
The Switch Control on the Standby SPE is being tested
1. For recommended maintenance procedure, refer to
ABORT Error Code 1030 in STBY-SPE Maintenance
documentation.
2012
ABORT
Internal system error
2013
2100
none
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...