
test modem-pool
Issue 4 May 2002
8-461
555-233-123
test modem-pool
This command performs hardware diagnostic tests on the specified modem pool
group or an individual member of a specified group (Combined or Integrated). A
Combined modem-pool group consists of pairs of Analog and Digital Line ports.
One pair of Analog and Digital Line ports used for modem-pooling is called a
conversion resource. An Integrated group consists of modem-pool circuit packs,
each containing two conversion resources. Therefore, when a member number is
specified for a Combined modem-pool group, one conversion resource is tested,
and when a member number is specified for an Integrated modem-pool group,
two conversion resources are tested.
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test
modem-pool
group
number
member
number
short
long
repeat
number
clear
schedule
The administered group number (1-5)
The administered member number
(1-32). A member is a pair of analog
and digital line ports (two pair for the
Integrated modem-pool).
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
Number of times each test in the
sequence is repeated (1-100)
This option causes the test sequence
(short or long) to repeat until the alarm
(if any) is cleared or a single test in the
sequence fails.
1
Command is validated and then a
scheduling form displays to schedule
execution of the command. The
command is then placed in the
command queue and is executed at
the specified time. The information
displayed by the command is sent to
the system printer instead of the
screen.
2
Examples:
test modem-pool 1
test modem-pool 1 schedule
test modem-pool 1/3 l r 2
test modem-pool 1/3 l r 2 schedule
test modem-pool 2 r 2
test modem-pool 2 l
1
If no alarms are registered against the maintenance object then the test sequence is run only once. The long
clear option forces a clear of all alarms if no errors are encountered during testing. The short clear option only
clears alarms pertinent to tests in the short sequence. SEE WARNING BELOW
2
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
Sequence
= short;
repeat = 1
none
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...