
VAL-PT (Voice Announcements over LAN Packet/Port)
Issue 4 May 2002
10-1969
555-233-123
2100
ABORT
Could not allocate the necessary system resources to run test.
Retry the command at 1-minute intervals, up to 5 times.
Escalate if the problem persists.
FAIL
VAL circuit pack detected test failure.
If the problem persists, reset the circuit pack (busyout board
UUCSS, reset board UUCSS, and release board UUCSS).
If the problem persists, replace the circuit pack.
PASS
Port circuitry functioning properly.
Table 10-706.
TEST #1275 SCOTCH Synchronous Looparound Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...