
test inads-link
Issue 4 May 2002
8-447
555-233-123
Once the call is answered by INADS, the system sends a message with a test
alarm type. INADS acknowledges receipt of the message and creates a trouble
ticket. The trouble ticket is closed immediately and has a “INADS LINK TEST”
message entered in the description field. If an alarm is raised while the test call is
up, the system does not send an alarm message over the existing link. The
normal retry mechanism is followed, which means an attempt to make a call to
INADS to report the error takes place 7 minutes later. An INADS trouble ticket is
created only if the connection is successfully established and a message is sent
to the system acknowledging that INADS received the system message.
The
Maintain Process Circuit Packs
field must be set to yes on the inads
and technician permission forms. This provides permissions to execute the test
inads-link command. This field can be changed by executing a change
permission login command.
No alarms are raised on the system and attendant alarm and acknowledgment
lamp states are not changed as a result of the test inads-link command. The test
does not run during periodic or scheduled maintenance.
Output
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test inads-link
1
2
First OSS telephone number
Second OSS telephone number
Examples:
test inads-link
test inads-link 1
test inads-link 2
init
inads
craft
nms
1st OSS
number
none
Command
successfully
completed
Test passed
Command failed
Link was up, there was an active alarm that the switch needs
to report, or there was a problem with the call.
NOTE:
An entry is made in the error log describing why
the inads-link test failed.
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...