
CO-DS1 (DS1 CO Trunk)
Issue 4 May 2002
10-427
555-233-123
1003
ABORT
The system could not allocate a tone receiver for the test. The
system may be oversized for the number of tone detectors
present or some of the tone detectors may be out of service.
Issue the list measurements tone-receiver command to
display basic information about the system’s tone receivers.
1. Look for TTR-LEV errors in the error log. If present, refer
to the TTR-LEV maintenance documentation.
2. Look for TONE-PT errors in the error log. If present, refer
to the TONE-PT maintenance documentation.
3. If neither condition exists, retry the test at 1-minute
intervals for a maximum of 5 times.
1004
ABORT
The port has been seized by a user for a valid call. Use the
status station or status trunk command to determine when
the port is available for testing.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If the test continues to abort, and the port is not in use,
escalate the problem.
1018
ABORT
The test was disabled via translation. You may want to
determine why the test has been disabled before you enable it.
1. Verify that the ’Maintenance Test’ field on the ’Trunk
Administration' screen is set to 'n.’ To enable the test,
change the trunk administration and enter 'y' into the
'Maintenance Test' field.
2. Repeat the test.
1020
ABORT
The test did not run due to a previously existing error on the
specific port or a more general circuit pack error.
1. Examine Error Log for existing errors against this port or
the circuit pack and attempt to diagnose the previously
existing error.
Table 10-160.
TEST #7 Conference Circuit Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...