
BRI-SET, ASAI-ADJ, BRI-DAT
Issue 4 May 2002
10-321
555-233-123
SPID Facility Test
This test is used to verify the wiring and operation of the signaling link between
the switch and a endpoint or adjunct on a BRI interface. This test is not
executed from the administration terminal, but rather is executed by using a
BRI test set equipped with a display. The test set may replace the BRI set,
ASAI or Avaya adjunct under test by plugging it into the same jack or by bridging it
onto the wiring at some point between the switch and the endpoint (or adjunct),
thereby creating a pseudo-BRI multipoint configuration.
When plugged into the port in this manner, the test set establishes a signaling link
connection with the switch and attempts to complete SPID initialization by using
the Service SPID administered for the system (see the System Maintenance
Administration Form). If the test set displays the correct administered port address
for the endpoint or adjunct under test, the test passes (see Service SPID Display
which follows). If after one minute nothing is displayed on the test set, the test
fails.
Table 10-127.
SPID Facility Test
Test
Result
Description/Recommendation
FAIL
No response is received from the endpoint.
1. Check the physical wiring between the switch and the endpoint or
adjunct.
FAIL
Display does not match administered port address for the endpoint or
adjunct.
1. Change station administration for endpoint or adjunct to match displayed
port address.
PASS
Display matches administered port address for the endpoint or adjunct.
For BRI endpoints:
1. Verify that the SPID values administered in the switch and the endpoint
are consistent.
2. If the SPID values are correct, replace the endpoint.
3. If test continues to fail, escalate the problem.
For ASAI adjuncts:
1. Verify that the TEI values administered in the switch and the adjunct are
consistent.
2. If the TEI values are correct, consult the recommended repair
procedures of the manufacturer for the adjunct.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...