
ANL-LINE (8-Port Analog Line), ANL-NE-L (8-Port Neon
Analog Line)
Issue 4 May 2002
10-89
555-233-123
NPE Crosstalk Test (#6)
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain, and provides conferencing functions on a
per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel talks
on the selected time slot and never crosses over to time slots reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is usually only part of a port’s Long Test Sequence
and takes about 20 to 30 seconds to complete.
Table 10-32. TEST #6 NPE Crosstalk Test
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available.
The port may be busy with a valid call. Use the display port
PCSSpp command to determine the station extension. Use
the status station command to determine the service state of
the port. If the service state indicates that the port is in use,
then the port is unavailable for certain tests. You must wait
until the port is idle before retesting.
1. If the port status is idle, then retry the command at
1-minute intervals a maximum of 5 times.
1001
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1002
ABORT
The system could not allocate time slots for the test. The
system may be under heavy traffic conditions or it may have
time slots out-of-service due to TDM-BUS errors. Refer to
“TDM-BUS (TDM Bus)” Maintenance documentation to
diagnose any active TDM-BUS errors.
1. If system has no TDM-BUS errors and is not handling
heavy traffic, repeat test at 1-minute intervals a maximum
of 5 times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...