
Maintenance Object Repair Procedures
555-233-123
10-1808
Issue 4 May 2002
Table 10-657.
TEST #40 Tone Generator Transmission Test
Error
Code
Test
Result
Description/Recommendation
None
ABORT
The system was not able to allocate all the resources needed
for this test or there was an Internal System Error.
1
ABORT
The system could not allocate all the resources needed to test
the DTMF tones.
1001
ABORT
The system was not able to put the tone generation facility in
the appropriate mode to test it.
1002
ABORT
The system could not allocate time slots for the test
connection. This can happen when the system is heavily
loaded. If the system is not heavily loaded, then test the TDM
Bus via test tdm port-network PN# . Refer to TDM-BUS
section for details.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If the test continues to abort, follow normal escalation
procedures.
1003
ABORT
The system could not allocate a tone receiver for the test
connection. This can happen when the system is heavily
loaded or there is not a Tone Detector circuit pack in the port
network where this test is being executed.
1. Make sure there is a Tone Detector circuit pack in the
same port network.
2. If a Tone Detector circuit pack is missing, install one in the
same port network.
3. Allow approximately 1 minute for Tone Detector
maintenance to run on the newly inserted Tone Detector
circuit pack.
4. Retry the command at 1-minute intervals a maximum of 5
times.
5. If the test continues to abort, follow normal escalation
procedures.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...