
Maintenance Object Repair Procedures
555-233-123
10-948
Issue 4 May 2002
1144
ABORT
The Packet Bus in the PPN is out of service.
1. Follow the repair procedures for the Packet Bus.
2. Enter test port PCSSpp long and check the results of
this test (939).
2012
2100
ABORT
ABORT
Internal system error
Could not allocate the necessary system resources to run this
test
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
The Loopback test has failed.
1. If this test fails repeatedly wait until all of the ports on the
board are idle (not in use) and reset the circuit pack. To
reset the circuit pack enter the commands busyout board
PCSS and reset PCSS.
2. Repeat the test, and if the test continues to fail replace the
circuit pack.
PASS
1. Connectivity of the D-channel over the Packet Bus is
operational.
Table 10-347.
TEST #939 Signaling Port Packet Bus Loopback — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...