
Packet Bus Fault Correction
Issue 4 May 2002
9-33
555-233-123
Figure 9-7.
Carrier Rewiring Example
Procedure 4 is organized into two parts, as follows:
Part 1:
1. Power down the PN. See
section in
‘‘Routine Maintenance Procedures’’
2. Replace all of the TDM/LAN cables and both TDM/LAN terminators.
3. Restore power to the PN. See
‘‘Routine Maintenance Procedures’’
4. Determine if the packet bus fault is still present.
5. If the fault is present, go to Part 2.
Part 2:
Processor Port Network:
1. Terminate the Packet Bus so that it extends only from the Active control
carrier (that is, the carrier that contains the Active SPE) to the carrier that
contains the Maintenance/Test circuit pack. To allow this procedure to
isolate the failure to the smallest possible number of carriers, place the
Maintenance/Test circuit pack into a carrier that contains a processor
complex, if possible.
Terminator
TDM/LAN
Cable
Normal Cabinet
(Rear View)
Control Carrier
Modified Cabinet
(Rear View)
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...