
TIE-TRK (Tie Trunk)
Issue 4 May 2002
10-1775
555-233-123
1014
ABORT
The test was aborted because the circuit pack has not been
inserted into the system.
1. Use list configuration board to make sure the circuit
pack is inserted in the carrier.
2. If the board is not inserted, make sure the circuit pack is
inserted in the carrier and fully seated.
3. If the test continues to fail, escalate problem.
1040
ABORT
This test is not performed for trunk ports administered as
“access endpoints.”
1. Verify this port is an access endpoint by using the display
port command.
2. If the port has been administered as an access endpoint,
this test should abort.
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
Could not allocate the necessary system resources to run the
test. This could be due to a failure to seize the port.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1
FAIL
The E lead test failed due to an on-board port problem.
1. Replace the circuit pack.
2
FAIL
The M lead test failed. The EPF has experienced an
overcurrent condition, perhaps due to the external M lead.
1. To make sure the problem is on-board, disconnect the
facility from the pack and retry the test.
2. If the test fails, replace the circuit pack. Otherwise, check
the external wiring toward the far-end PBX.
Table 10-651.
TEST #74 Tie Trunk EPF Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...