
TBRI-PT (TN2185 ISDN Trunk-Side BRI Port)
Issue 4 May 2002
10-1671
555-233-123
NPE Crosstalk Test (#617)
This test is conditionally destructive.
One or more NPEs reside on each circuit pack with a TDM Bus interface. The
NPE controls port connectivity and gain and provides conferencing functions on a
per-port basis. The NPE Crosstalk Test verifies that this port’s NPE channel talks
on the selected time slot and never crosses over to time slots reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is part of a port’s Long Test Sequence and takes
approximately 20 to 30 seconds to complete. Crosstalk testing is performed on
both B-channels (B1 and B2) associated with a BRI port. If this test fails on either
channel, any channel connected to the port is taken out-of-service. This test
aborts if the port and its associated channels are not in the idle state.
Table 10-613.
TEST #617 NPE Crosstalk Test
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available.
The port may be busy with a valid call. Use the display port
PCSSpp command to determine the station extension or
trunk group/member number of the port. Use the status
bri-port PCSSpp command to determine the service state of
the port. If the service state indicates that the port is in use,
then the port is unavailable for certain tests. Wait until the port
is idle before retesting.
1. If the port status is idle, then retry the command at
1-minute intervals a maximum of 5 times.
1004
ABORT
The port has been seized by a user for a valid call. Use the
status bri-port command to determine when the port is
available for testing.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If the test continues to abort and the port is not in use,
escalate the problem.
1005
ABORT
This test is not valid for this type of translation. Ports
administered as “ASAI” or “ADJK” can not run this test,
because the B channels associated with the port are not used
by ASAI or AT&T Adjunct Links. This is a normal condition.
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...