Maintenance Object Repair Procedures
555-233-123
10-1104
Issue 4 May 2002
6000
ABORT
System resources needed to complete the test could not be
allocated for the digital section of the Modem Pool
conversion resource. Ordinarily, this means the conversion
resource or other hardware used during the test was in use.
1. Wait one minute and attempt the test again.
2. If it is absolutely necessary to test the conversion
resource, the call must be dropped by issuing a
busyout port PCSS command against the conversion
resource. Issue the release port PCSS command. The
busyout and release of the port drop any existing calls
on that port.
3. Run the test again.
4. If the same error occurs while the conversion resource
is idle, busyout and release both Modem Pool
conversion resources on the TN758 Pooled Modem
circuit pack containing the conversion resource under
test. This action drops any existing calls on that circuit
pack.
5. If the test continues to abort, replace the Pooled
Modem circuit pack and retest.
6. If the test continues to abort with this error code after
circuit pack replacement, escalate the problem.
6001
ABORT
System resources needed to complete the test could not be
allocated for the analog section of the Modem Pool
conversion resource.
1. Follow the test procedures for the previous error code.
NONE
FAIL
The test failed. This error is internal to the Pooled Modem
circuit pack and does not involve external equipment or
interfaces.
1. Busyout both of the TN758 Pooled Modem conversion
resources on the circuit pack containing the failing
conversion resource.
2. If the test continues to fail, replace the Pooled Modem
circuit pack and retest.
3. If the circuit pack fails after replacement, escalate the
problem.
Table 10-415.
TEST #96 Modem Pool NPE Crosstalk Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...