
Maintenance Object Repair Procedures
555-233-123
10-278
Issue 4 May 2002
BRI Port Local TDM Loop Around Test (#619)
This test is destructive.
This test verifies the connectivity of a BRI port across the TDM Bus. It aborts if
calls associated with the port are in progress. Failure of this test indicates an
on-board fault associated with the port hardware on the circuit pack.
This Loop Around Test runs a series of individual tests on the two B-channels (B1
and B2) associated with the port. It is a collection of the following:
■
A Loop Around Test across the TDM Bus for B1.
■
A Conference Circuit Test for B1.
■
A Loop Around Test across the TDM Bus for B2.
■
A Conference Circuit Test for B2.
The tests are run in the above order. If one fails, the remaining tests in the
sequence are not executed. An error code is returned at that point.
This test is not executed for ABRI-PORT/ATT-PORT/LGATE-PT/ATTE-PT
because the B-channels associated with the port are not used by ASAI or Avaya
adjuncts.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
The Loop Around Test has failed.
1. If the test fails repeatedly, attempt to reset the circuit pack
if the other ports on the board are not in use. Reset the
circuit pack by issuing the busyout board PCSS and the
reset board PCSS commands.
2. If the test fails again, execute test port-network <pn#> on
the G3MT terminal. If this fails, follow failure procedures in
PKT-BUS section.
3. If tests executed in Step 2 pass, the problem is local to the
BRI board. Replace the circuit pack.
PASS
The BRI Port Local LAN Loop Around Test has passed.
Table 10-110.
TEST #618 BRI Port Local LAN Loop Around — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...