
SW-CTL (Switch Control)
Issue 4 May 2002
10-1581
555-233-123
Time of Day Clock Test (#95)
The short term accuracy of the Time of Day (TIME-DAY) clock is tested. The test
reads the clock once, waits a short time, and reads the clock again. The second
reading of the clock must be within certain limits relative to the first reading for the
test to pass. The display time command can be used to display the current
setting of the TIME-DAY clock.
Table 10-585.
TEST #95 Time of Day Clock Test
Error
Code
Test
Result
Description/Recommendation
1000
ABORT
The test was interrupted by a higher priority task.
1. Rerun the test at 1-minute intervals a maximum of 5
times.
2. If the test aborts 5 times, wait until the system is less
heavily used and rerun the test at that time.
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT
Refer to STBY-SPE for a description of these error codes
2012
ABORT
Internal system error
2013
ABORT
Could not allocate the necessary system resources to run
this test.
1. Retry the command at 1-minute intervals a maximum of
5 times.
2001
FAIL
The Time of Day clock could not be read.
1. Run the set time command and set the time to the
current time.
2. Run the Short Test Sequence several times to determine
if setting the time corrected the error. Proceed to Step 3
if the error is still occurring.
3. Replace the NetPkt or Netcon circuit pack at the
customer’s convenience (Standard system) or right
away (High or Critical Reliability system).
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...