
BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI
ISDN-BRI Port)
Issue 4 May 2002
10-287
555-233-123
Electronic Power Feed Inquiry (#622)
This test queries the BRI-LINE circuit pack for the status of the Electronic Power
Feed (EPF) supplied to a BRI endpoint or an ASAI or Avaya adjunct. If the EPF is
on and no overcurrent condition exists, this test passes. All other states are not
normal and indicate a problem with the endpoint or adjunct, the wiring to the
endpoint or adjunct, or the BRI-LINE circuit pack. This test is not run on the
TN2208 circuit pack or the TN2198 and will always return a pass for a TN2198.
The TN2208 has no power feeds.
Table 10-114.
TEST #622 Electronic Power Feed Inquiry
Error
Code
Test
Result
Description/Recommendation
1005
ABORT
This test is not valid for this port type. Ports on the TN2208
cannot run this test because this board does not have an
electronic power feed.
2000
ABORT
Response to the test was not received from the circuit pack
within the allowable time period.
1. If the test aborts repeatedly a maximum of five times,
reset the circuit pack via the busyout board PCSS
and reset board PCSS commands.
2. If the test aborts again, replace the circuit pack.
2012
ABORT
Internal System Error.
2100
ABORT
Could not allocate the necessary system resources to run
this test.
1. Retry the command at 1-minute intervals a maximum
of 5 times.
1
FAIL
The BRI-LINE circuit pack reports that it has detected an
overcurrent condition and has turned off the EPF.
1. As necessary, check and repair the wiring between the
circuit pack and the endpoint or adjunct. Check the
endpoints and replace one or both sets if the sets are
drawing too much current. Execute the test port
PCSSpp command and review the results of the EPF
Inquiry Test to verify the repair. If this test is still failing,
proceed to Step 2.
2. Execute the test port PCSSpp command, and review
the results of the Level 1 Status Inquiry Test. If this test
is also failing, then follow the repair procedure for the
Level 1 Status Inquiry Test. Otherwise, escalate this
problem to the next tier.
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...