
EXP-INTF (Expansion Interface Circuit Pack)
Issue 4 May 2002
10-781
555-233-123
Expansion Interface Fiber Out-of-Frame (FOOF)
Query Test (#238)
This test is a request to an Expansion Interface circuit pack to determine if it is
currently detecting the framing sequence on the incoming fiber data stream. If it
cannot detect this framing signal, the Expansion Interface circuit pack is not able
to establish a link with the opposite Expansion Interface circuit pack.
PASS
The Expansion Interface circuit pack has successfully
established a link with the opposite Expansion Interface circuit
pack.
1. If the status system command still indicates that this link is
down, it is possible that one or both of the Expansion
Interface circuit packs have been busied out.
2. If the link still does not come up, reset one or both
Expansion Interface circuit packs on the link.
0
NO
BOARD
No board was detected by the test.
1. Check the error log for wrong board (error 125) or no board
(error 131). Resolve either of these issues, if applicable.
2. Check that the board is properly translated and inserted. If
so, check for hyperactivity (error 1538). If hyperactive, use
the reset board PCSS command.
3. Run the test again. If it fails, the ID chip on board may be
bad. Replace the board and retest.
Table 10-290.
TEST #238 EI Fiber Out-of-Frame Query Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Internal system error
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
System resources required to run this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Continued on next page
Table 10-289.
TEST #237 EI Neighbor Query Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...