
Maintenance Commands and Trouble-Clearing Aids
555-233-123
8-442
Issue 4 May 2002
Feature Interactions
test hardware-group
Only one test hardware-group command can be active at
any given time.
TTI
If the test hardware-group command is issued with the
all-ports option when the TTI background task is active,
some unadministered ports may not be tested. In addition,
active alarms on line ports may be cleared by this task. The
status tti command can be used to determine the state of
the TTI background task.
Add Station
If a add station command is entered for an untranslated port
at the same time as it is being tested as part of the test
hardware-group command with the all-ports option, the
error message,
Object in use; please try later
displays, and the request fails.
Trunk administration
If an attempt is made to add an unadministered trunk port to
a trunk group at the same time as it is being tested as part of
the test hardware-group with the all-ports option, the error
message,
Object in use; please try later
displays,
and the request fails.
Save translation
If the test hardware-group with the all-ports option while a
translation save operation is active, some unadministered
ports may not be tested. All other hardware are tested
normally.
Hardware alarms
When a hardware error is detected by the test
hardware-group command, the hardware goes through the
standard escalation strategy. Alarms are raised on hardware
that manifest ’hard’ errors. This alarming strategy is the
same, regardless of whether the ports are translated or not.
System interaction
The performance of test hardware-group is affected by call
processing traffic, administration activity, choice of the short
or long option, whether the all-ports option is chosen,
whether the spe-interchange option is chosen, and other
demand maintenance activity.
Scheduled and
periodic maintenance
While executing the test hardware-group command, all
scheduled background maintenance, periodic background
maintenance, and data audits activity is suspended until the
command completes. When the test hardware-group
command is canceled or completes, all suspended periodic,
scheduled, and data audits background maintenance activity
are restarted where it left off.
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...