
Packet Bus Fault Correction
Issue 4 May 2002
9-33
555-233-123
Figure 9-7.
Carrier Rewiring Example
Procedure 4 is organized into two parts, as follows:
Part 1:
1. Power down the PN. See
section in
‘‘Routine Maintenance Procedures’’
2. Replace all of the TDM/LAN cables and both TDM/LAN terminators.
3. Restore power to the PN. See
‘‘Routine Maintenance Procedures’’
4. Determine if the packet bus fault is still present.
5. If the fault is present, go to Part 2.
Part 2:
Processor Port Network:
1. Terminate the Packet Bus so that it extends only from the Active control
carrier (that is, the carrier that contains the Active SPE) to the carrier that
contains the Maintenance/Test circuit pack. To allow this procedure to
isolate the failure to the smallest possible number of carriers, place the
Maintenance/Test circuit pack into a carrier that contains a processor
complex, if possible.
Terminator
TDM/LAN
Cable
Normal Cabinet
(Rear View)
Control Carrier
Modified Cabinet
(Rear View)
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...