
PE-BCHL (PRI Endpoint Port)
Issue 4 May 2002
10-1217
555-233-123
Audit and Update Test (#36)
This test sends port level translation data from the switch processor to the UDS1
interface circuit pack to ensure that the port’s translation is correct. The port audit
operation verifies the consistency of the current state of the port that is kept in the
UDS1 interface circuit pack and in the switch software.
Table 10-454.
TEST #36 Audit and Update Test
Error
Code
Test
Result
Description/Recommendation
ABORT
Internal system error
2000
ABORT
Response to the test request was not received within the
allowable time period.
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL
The test failed due to Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS
The port translation has been updated successfully. The
current port states kept in the UDS1 interface circuit pack and
in the switch software are consistent. If the port is busied out,
the test does not run, but returns PASS. To verify that the port
is in-service:
1. Enter status pri-endpoint <extension> to verify that the
port is in-service. If the port is in-service, no further action
is necessary. If the port is out-of-service, go to Step 2.
2. Enter the release pri-endpoint <extension> command
or the release port <PCSSpp> command to put the port
back into in-service.
3. Retry the test command.
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...