
ASAI-EPT
Issue 4 May 2002
10-181
555-233-123
2012
ABORT
Internal system error
2100
ABORT
Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1113
FAIL
The signaling link is not “bound” to the adjunct. For ASAI
adjuncts this error indicates that the link is disconnected at
Layer 2. Since the signaling link associated with the endpoint
has been identified by administration, the link is only
“unbound” from the endpoint when it is disconnected.
1. Execute the status bri-port PCSSpp command and refer
to the associated procedures for this command contained
in “BRI-PORT”.
PASS
The signaling link is connected at Layer 2 and “bound” to the
ASAI adjunct.
Table 10-58. TEST #626 Signaling Link Status Test — Continued
Error
Code
Test
Result
Description/Recommendation
Continued on next page
Summary of Contents for Definity SI
Page 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Page 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Page 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Page 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Page 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Page 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...